Moving the canoe
Carrying it with the fork-lift part of the way then we rolled it along on pieces of wood until we got it to the door. The Canoe had to be lifted up to the door of the warehouse using the forklift.


 

 

Once the canoe was inside it was smoothed out more and made more even on the inside and bottom using the planers and...............


A layer ws painted on the outside of the canoe.

Once the outside of the canoe is done it was turned over to do the inside, while the inside was being done a piece was being made to use for the head of the canoe, and the tail. Shaping them at proper measurement to fit the canoe.


Painting the inside of the canoe came next.


As this was being done the floorboards were being placed inside.